AVIC MITEK has moved Phase III of its Metal Additive Manufacturing Industrial Park in Xuzhou into operation, adding powder and LPBF lines as it works toward a 1,000-printer annual capacity target.

AVIC MITEK has started operating Phase III of its Metal Additive Manufacturing Industrial Park in Xuzhou, Jiangsu Province. The Chinese company, known for aerospace-grade metal powders and components, says the new phase brings its metal powder and laser powder bed fusion equipment businesses onto one site.

What Phase III adds

The park sits in Xuzhou's Airport Economic Development Zone and has been under construction since 2020. It now covers more than 300 acres, with 100,000 square meters of production space in use out of a planned 200,000 square meters. Phase III added one R&D office building and three factory buildings.

On the materials side, AVIC MITEK says it is adding more than 20 powder production lines focused on titanium alloy and high-temperature alloy powders. The company also plans to industrialize recycling of titanium alloy waste. On the equipment side, it relocated existing workshops into the park, where more than 10 LPBF printer models with build sizes up to 1,500 mm are being installed, tested and verified.

Capacity targets and the bigger plan

Across all three phases, the company reports 2,000 tons of added titanium alloy and high-temperature alloy powder capacity and an annual production capability of 300 3D printers. Looking further ahead, AVIC MITEK is working toward 10,000 tons of metal powder and 1,000 3D printers per year, though it has not shared a timeline for those targets.

The move fits the company's 15th Five-Year Plan strategy to build a complete metal 3D printing ecosystem. Alloy raw materials, powder production, printer manufacturing, atomization furnaces and application services now sit under one operational footprint. Keeping powder and machines close can tighten feedback between material quality and print results, an advantage that matters as manufacturers push toward serial production.

Installation and commissioning of the newly added powder and LPBF lines are still underway, with production ramping in batches. If AVIC MITEK reaches its stated targets, the Xuzhou site would stand as one of the larger integrated metal additive manufacturing operations in China.

Disclosure: Some links are affiliate links. We may earn a small commission at no extra cost to you.

Comments (0)

No comments yet. Be the first!

Leave a Comment