HP's Multi Jet Fusion build-planning software is being connected to Xometry Workcenter so partner shops can fill unused build space with marketplace orders. US rollout starts in early 2027.

The integration, stated plainly

HP and Xometry announced on November 17 at Formnext in Frankfurt that HP's Multi Jet Fusion build-planning software will connect directly to Xometry Workcenter, the job management platform Xometry gives its manufacturing partners. As a partner plans a build, HP's software lays out the jobs the shop already has and flags the free space left in the powder bed. The partner then sees matching Xometry orders that fit that space and accepts the ones that work. The integration is limited to Xometry Partner Network shops running HP MJF systems. It launches in the United States in early 2027, with Europe expected to follow.

The pitch on both sides is arithmetic. A partially filled MJF build wastes material, machine time and furnace capacity. Fill the gaps with someone else's demand and the shop earns more per build while Xometry's customers get faster turnaround and lower prices. Xometry CEO Sanjeev Singh Sahni put the strategy in one line: the company's intelligence reaches build planning, right before parts go on the machine. HP additive chief Alex Monino framed it as maximizing build utilization and cutting material waste across the installed base.

Why software, why now

Worth saying out loud: this is not a hardware story. That is what makes it interesting. The MJF installed base already exists. Every previous efficiency push in this market has been a machine purchase. HP launched the 3D Build Optimizer at Formnext 2024, and early user Forecast 3D projected a 20 percent cut in total build costs from that tool alone. The limits of build optimization software are the jobs a shop can see, though. If a shop only nests its own orders, the bed fills to whatever its order book allows.

Xometry's move is to feed external demand into the nesting step itself. Third-party tools are circling the same problem from other directions: Phasio and Dyndrite built a pass-through workflow from customer demand to validated builds, and AMIS says its software can nest 1,500 parts in an MJF Build Box at 14 percent nesting density in under a minute. What the Xometry integration adds is a demand pipe attached to the planner. That is the difference between a better packing algorithm and a marketplace.

It fits the company's pattern from this year. Xometry embedded its pricing and manufacturability intelligence into Siemens Xcelerator, crossed a $1 billion annualized revenue run rate in Q3 2026, and now sits at the machine scheduling step. Each step moves the company closer to the shop floor and further from being a quote website.

The hard questions

Two things will decide whether this works in practice rather than in the press release. First, part compatibility. An MJF bed shares material, and parts share post-processing routes. A shop accepting a third-party job into its build needs the material spec, quality paperwork and delivery dates to match its own, automatically, or the time saved in setup gets spent in exceptions. Second, whether partners route their best work into a marketplace queue. Shops join Xometry to fill capacity they cannot sell directly. Feeding a Xometry order into a build that contains a direct customer's parts means the marketplace sits inside the shop's most sensitive scheduling decision. Some partners will like the revenue. Some will not like the visibility.

What I read into it

Distributed manufacturing companies spent a decade building demand aggregation on top of dumb factories. This is the inversion: production software becoming the demand channel. If the US pilot in early 2027 shows measurable build utilization gains, every machine OEM with fleet software has to decide whether it attaches a marketplace to its planner or rents that layer to someone else. For shops running MJF machines right now, the useful question before launch is simple. Find out whether your Workcenter profile is set up to accept injected jobs, because the first partner who turns on a half-empty bed and lets the network fill it gets paid for air.

Disclosure: Some links are affiliate links. We may earn a small commission at no extra cost to you.

Comments (0)

No comments yet. Be the first!

Leave a Comment